Just added to your cart

    View cart ()

    Ford Maverick (1988-1994) Superior Engineering Superior Heavy Duty Hub Strengthening Rings Suitable For Nissan Patrol GQ/GU (Pair) - HUSR-A-PTR10-A

    Regular price
    $99.00
    Sale price
    $99.00
    Regular price
    $49.00
    Sold out
    Unit price
    per 

    Ford Maverick (1988-1994) Superior Engineering Superior Heavy Duty Hub Strengthening Rings Suitable For Nissan Patrol GQ/GU (Pair) - HUSR-A-PTR10-A available on AfterPay. We deliver Australia-wide! – Sydney, Brisbane, Melbourne, Adelaide & Perth.

    Tax included. Shipping calculated at checkout.

    PRODUCT DESCRIPTION

    Nissan Patrol GU and GQ manual locking hubs have a tendancy to split under heavy loads.
    Superior Engineering has a solution, These Heavy Duty Streenghening Rings will help to keep your hubs together.

    Laser cut and finished in hard wearing SF5 Zinc Plating these hub rings will withstand the abuse offroad.

    Sold as a pair

    NOTE: These rings may not fit some models of aftermarket hubs, they will work with OE Nissan Hubs.

    Superior Heavy Duty Hub Strengthening Rings Suitable For Nissan Patrol GQ/GU (Pair) - SUP-NISHUBRING

    Superior Heavy Duty Hub Strengthening Rings Patrol GQ/GU busted hub

    Don't let this happen to your Hubs

    Superior Heavy Duty Hub Strengthening Rings Suitable For Nissan Patrol GQ/GU (Pair) - SUP-NISHUBRING

    Shipping Policy

    Superior Engineering offer custom built suspension solutions, with unique adjustability and performance.

    These kits are assembled to order to suit your requirements, with an average lead time that can vary between 1-3 weeks.

    If you need a specific eta, please contact us before ordering and we will be sure to assist you.

    Consolidated Freight Option

    Consolidated freight allows PPD Performance to combine multiple orders onto a single pallet and transfer them together, reducing freight costs by sharing them across orders.

    This option adds an additional 1–3 week delay on top of the standard 1–3 week supplier lead time.

    If you require your item sooner, please contact us before or after ordering to discuss specific lead times or faster freight options.