Just added to your cart

    View cart ()

    Isuzu D-max (2012-2016) Ute Diesel 3.0ltr TD Superior Monotube IFP 2.0 3-4 Inch (75-100mm) Lift Kit

    Regular price
    $4,539.00
    Sale price
    $4,539.00
    Regular price
    Sold out
    Unit price
    per 

    Isuzu D-max (2012-2016) Ute Diesel 3.0ltr TD Superior Monotube IFP 2.0 3-4 Inch (75-100mm) Lift Kit available on AfterPay. We deliver Australia-wide! – Sydney, Brisbane, Melbourne, Adelaide & Perth.

    Tax included. Shipping calculated at checkout.

    PRODUCT DESCRIPTION

    Please Note: Due to supply issues, the colour of the coil springs you receive may vary from the coils pictured. All coils used in Superior Engineering Kits are made from quality Australian manufacturers.

    This is a Premium Superior Monotube IFP 3-4" Inch Lift Kit Suitable For Holden Colorado and Isuzu Dmax 2012-16.

    This lift kit comprises of the following 4x4 accessories and suspension parts:

    • 2 x Front Coil Springs
    • 2 x Front Superior Monotube IFP Struts
    • 2 x Rear Superior Monotube IFP Shocks
    • 2 x Superior Extended Rear Shackles
    • 2 x Rear Leaf Springs
    • 4 x U-Bolts
    • 1 x Polyurethane Bush Kit
    • 2 x Strut Tops
    • 1 x Superior Diff Drop
    • 1 x Superior Billet UCA's

    For warranty reasons, when fitting a lift kit you should always fill out a "Fitment Form".

    Superior Monotube IFP 2.0 3-4 Inch (75-100mm) Lift Kit Suitable For Holden Colorado/Isuzu Dmax 2012-16 (Kit) - SUP-MTNG-COL3412

    Shipping Policy

    Superior Engineering offer custom built suspension solutions, with unique adjustability and performance.

    These kits are assembled to order to suit your requirements, with an average lead time that can vary between 1-3 weeks.

    If you need a specific eta, please contact us before ordering and we will be sure to assist you.

    Consolidated Freight Option

    Consolidated freight allows PPD Performance to combine multiple orders onto a single pallet and transfer them together, reducing freight costs by sharing them across orders.

    This option adds an additional 1–3 week delay on top of the standard 1–3 week supplier lead time.

    If you require your item sooner, please contact us before or after ordering to discuss specific lead times or faster freight options.