Just added to your cart

    View cart ()

    Nissan Patrol (12/1997-04/1999) Superior Engineering Superior Heavy Duty Rated Towing Point Suitable For Nissan Patrol GQ/GU (With Hook and Bow Shackle) (Each) - GQGURPLHD

    Regular price
    $149.00
    Sale price
    $149.00
    Regular price
    $149.00
    Sold out
    Unit price
    per 

    Nissan Patrol (12/1997-04/1999) Superior Engineering Superior Heavy Duty Rated Towing Point Suitable For Nissan Patrol GQ/GU (With Hook and Bow Shackle) (Each) - GQGURPLHD available on AfterPay. We deliver Australia-wide! – Sydney, Brisbane, Melbourne, Adelaide & Perth.

    Tax included. Shipping calculated at checkout.

    PRODUCT DESCRIPTION

    Heavy Duty "Rated" Tow Point with Hook and Bow Shackle Suitable For GQ & GU Nissan Patrol.

    This Superior Engineering-rated towing point has a whopping 16mm thick plate and is rated up to 5 Tonnes (5,000 Kilograms / 11,000 Pounds). It also comes fitted with a 4.5 Tonne (4,500 Kilogram) rated tow hook and a 4.5 Tonne (4,500 Kilogram) rated Bow shackle.

    The plate is laser cut to ensure an easy fit to the original bolt holes inside the chassis on the driver's side.

    It will not fit with all bullbars (i.e., GQ with ARB) and may not fit GQ with the OEM bumper.

    Now, you can recover or be towed in confidence!

    Comes with all high tensile bolts for easy installation.

    NOTE: This recovery point may not work with all underguards and will not fit with the large radiator or drop cross member. Please check your clearance before ordering.




    Shipping Policy

    Superior Engineering offer custom built suspension solutions, with unique adjustability and performance.

    These kits are assembled to order to suit your requirements, with an average lead time that can vary between 1-3 weeks.

    If you need a specific eta, please contact us before ordering and we will be sure to assist you.

    Consolidated Freight Option

    Consolidated freight allows PPD Performance to combine multiple orders onto a single pallet and transfer them together, reducing freight costs by sharing them across orders.

    This option adds an additional 1–3 week delay on top of the standard 1–3 week supplier lead time.

    If you require your item sooner, please contact us before or after ordering to discuss specific lead times or faster freight options.