Just added to your cart

    View cart ()

    Nissan Patrol (12/1997-2016) Superior Engineering Superior Billet Series 6061 - T6 Alloy Bump Stop Extensions Suitable For Nissan Patrol GQ/GU Front 50mm - NPFBX50-V1

    Regular price
    $85.00
    Sale price
    $85.00
    Regular price
    $85.00
    Sold out
    Unit price
    per 

    Nissan Patrol (12/1997-2016) Superior Engineering Superior Billet Series 6061 - T6 Alloy Bump Stop Extensions Suitable For Nissan Patrol GQ/GU Front 50mm - NPFBX50-V1 available on AfterPay. We deliver Australia-wide! – Sydney, Brisbane, Melbourne, Adelaide & Perth.

    Tax included. Shipping calculated at checkout.

    PRODUCT DESCRIPTION

    These front Bump stop extensions for the front of GQ/GU Patrols, help to keep your front shock from closing up fully causing damage to the piston and/or seals.

    Manufactured from 6000 Series Alloy Billet and finished in a beautiful Black Anodize coating.

    Just work out the size you need to to extend down the factory bump stop and go from there.

    Extension Height = overall lift height of the spacer

    SOLD AS A PAIR

    Superior Bump Stop Extensions Nissan Patrol GQ/GU Front

    Superior Alloy Bump Stop Extensions Suitable For Nissan Patrol GQ/GU Front 50mm (Pair) - NPFBX50-V1
    Bump stop NOT INCLUDED

    PLEASE NOTE: These spacers are also used as the extensions for our 80 Series style rear bump stop conversion as shown below.
    This kit can be purchased separately in the Related Products Tab.

    Superior Alloy Bump Stop Extensions Suitable For Nissan Patrol GQ/GU Front 50mm (Pair) - NPFBX50-V1

    Shipping Policy

    Superior Engineering offer custom built suspension solutions, with unique adjustability and performance.

    These kits are assembled to order to suit your requirements, with an average lead time that can vary between 1-3 weeks.

    If you need a specific eta, please contact us before ordering and we will be sure to assist you.

    Consolidated Freight Option

    Consolidated freight allows PPD Performance to combine multiple orders onto a single pallet and transfer them together, reducing freight costs by sharing them across orders.

    This option adds an additional 1–3 week delay on top of the standard 1–3 week supplier lead time.

    If you require your item sooner, please contact us before or after ordering to discuss specific lead times or faster freight options.