Just added to your cart

    View cart ()
    Clutch Direct Product Image

    Nissan Patrol (1987-2016) Superior Engineering Superior Rear Long Arm Kit to suit GQ/GU

    Regular price
    $795.00
    Sale price
    $795.00
    Regular price
    Sold out
    Unit price
    per 

    Nissan Patrol (1987-2016) Superior Engineering Superior Rear Long Arm Kit to suit GQ/GU available on AfterPay. We deliver Australia-wide! – Sydney, Brisbane, Melbourne, Adelaide & Perth.

    Tax included. Shipping calculated at checkout.

    PRODUCT DESCRIPTION

    SKU: GQGULONGARM2-XXX  |  PID: 1718

    Please see compatibility tab to confirm fitment.

    Compatibility
    • Nissan Patrol GQ [1990 - 12/1997] Wagon LWB Petrol 3.0 & 4.2ltr
    • Nissan Patrol GQ [1990 - 12/1997] Wagon LWB Diesel 4.2, 2.8 & 4.2ltr TD
    • Nissan Patrol GQ [1990 - 12/1997] Ute Coil Petrol 3.0 & 4.2ltr
    • Nissan Patrol GQ [1990 - 12/1997] Ute Coil Diesel 4.2, 2.8 & 4.2ltr TD
    • Nissan Patrol GU [2000 - 2016] Ute Coil Diesel 3ltr
    • Nissan Patrol GU [12/1997 - 2010] Ute Coil All 4.2 & 4.2ltr TD
    • Nissan Patrol GU [12/1997 - 04/1999] Wagon Diesel 2.8ltr TD
    • Nissan Patrol GU [12/1997 - 04/1999] Wagon Diesel 4.2ltr TD 98-99
    • Nissan Patrol GU [2000 - 2016] Wagon Diesel 3ltr TD
    • Nissan Patrol GU [12/1997 - 04/1999] Wagon Petrol 4.5ltr
    • Nissan Patrol GU [2000 - 2010] Wagon Petrol 4.8ltr
    • Nissan Patrol GU [2000 - 2010] Wagon Diesel 4.2ltr TD 2000 on
    • Ford Maverick Series 1 [1988 - 1994] Wagon All 4.2ltr
    • Nissan Patrol GQ [08/1987 - 1989] Wagon All 4.2ltr
    • Nissan Patrol GQ [08/1987 - 1989] Ute Coil All 4.2ltr
    Shipping & Availability

    Superior Engineering offer custom built suspension solutions, with unique adjustability and performance.

    These kits are assembled to order to suit your requirements, with an average lead time that can vary between 1-3 weeks.

    If you need a specific eta, please contact us before ordering and we will be sure to assist you.

    Consolidated Freight Option

    Consolidated freight allows PPD Performance to combine multiple orders onto a single pallet and transfer them together, reducing freight costs by sharing them across orders.

    This option adds an additional 1–3 week delay on top of the standard 1–3 week supplier lead time.

    If you require your item sooner, please contact us before or after ordering to discuss specific lead times or faster freight options.