Just added to your cart

    View cart ()

    Nissan Patrol (1990-1997) Wagon LWB Petrol 3.0 & 4.2ltr Superior Bump Stop Extensions

    Regular price
    $310.00
    Sale price
    $310.00
    Regular price
    Sold out
    Unit price
    per 

    Nissan Patrol (1990-1997) Wagon LWB Petrol 3.0 & 4.2ltr Superior Bump Stop Extensions available on AfterPay. We deliver Australia-wide! – Sydney, Brisbane, Melbourne, Adelaide & Perth.

    Tax included. Shipping calculated at checkout.

    PRODUCT DESCRIPTION

    If you have lifted your patrol, then you are probably running longer than standard shocks in the rear.

    If this is the case then you need to run extended bump stops to reduce the chance of damaging your shocks or other suspension components.

    Our bump stops are designed with longer than standard soft bumps to limit travel more softly than standard bumps would, whilst still providing adequate support to protect your valuable suspension components.

    We have also offset the mounting in as far as possible to allow full clearance for the tyre on up travel.

    Uncompressed length 147mm.
    Compressed length 118mm.

    This is under mild load, more compression can be achieved safely when needed.

    Sold as a pair.

    Mounting bolts not included.

    Uses your original bolts to attach to the chassis.

    Superior Bump Stop Extensions Suitable For Nissan Patrol GQ/GU Rear (Pair) - SUP-NRBSK

    Superior Bump Stop Extensions Suitable For Nissan Patrol GQ/GU Rear (Pair) - SUP-NRBSKSuperior Bump Stop Extensions Suitable For Nissan Patrol GQ/GU Rear (Pair) - SUP-NRBSK

    Superior Bump Stop Extensions Suitable For Nissan Patrol GQ/GU Rear (Pair) - SUP-NRBSK

    Superior Bump Stop Extensions Suitable For Nissan Patrol GQ/GU Rear (Pair) - SUP-NRBSK

    Superior Bump Stop Extensions Suitable For Nissan Patrol GQ/GU Rear (Pair) - SUP-NRBSK

    Shipping Policy

    Superior Engineering offer custom built suspension solutions, with unique adjustability and performance.

    These kits are assembled to order to suit your requirements, with an average lead time that can vary between 1-3 weeks.

    If you need a specific eta, please contact us before ordering and we will be sure to assist you.

    Consolidated Freight Option

    Consolidated freight allows PPD Performance to combine multiple orders onto a single pallet and transfer them together, reducing freight costs by sharing them across orders.

    This option adds an additional 1–3 week delay on top of the standard 1–3 week supplier lead time.

    If you require your item sooner, please contact us before or after ordering to discuss specific lead times or faster freight options.