Just added to your cart

    View cart ()

    Nissan Patrol (1990-1997) Wagon LWB Petrol 3.0 & 4.2ltr Superior Castor Bushes 3 Degree Polyurethane Coil (Kit) - SPF1721XK

    Regular price
    $275.00
    Sale price
    $275.00
    Regular price
    Sold out
    Unit price
    per 

    Nissan Patrol (1990-1997) Wagon LWB Petrol 3.0 & 4.2ltr Superior Castor Bushes 3 Degree Polyurethane Coil (Kit) - SPF1721XK available on AfterPay. We deliver Australia-wide! – Sydney, Brisbane, Melbourne, Adelaide & Perth.

    Tax included. Shipping calculated at checkout.

    PRODUCT DESCRIPTION

    Superior Polyurethane Castor Bushes 3 Degree Suitable For Coil

    Superior Engineering Brand of Polyurethane 3 degree castor bushes are Suitable For 3 Inch coil lift kits.

    They are a steel outer cased bush to stop the bush from rotating in the castor arm.

    Castor bushes need to be pressed into the radius arms, a minimum of an 8-tonne shop press is needed to fit them.

    The bushes come with a drawing to align them correctly in the radius arms.

    When a lift is performed, the castors have to be changed due to the radius arms being connected to the chassis and the diff. If you do not fit castors correctly, the vehicle will wander on the road and this is a very serious and dangerous combination that may result in the vehicle being the cause of an accident.

    It is recommended if you have a 2-inch lift, to fit 2-degree castor bushes.

    If you have a 3-inch lift, then you should fit 3-degree castor bushes.

    Any more than a 3-inch lift, you should look at castor plates.

    Pack of 4.

    Superior Castor Bushes 3 Degree Polyurethane Coil (Kit) - SPF1721XK

    Shipping Policy

    Superior Engineering offer custom built suspension solutions, with unique adjustability and performance.

    These kits are assembled to order to suit your requirements, with an average lead time that can vary between 1-3 weeks.

    If you need a specific eta, please contact us before ordering and we will be sure to assist you.

    Consolidated Freight Option

    Consolidated freight allows PPD Performance to combine multiple orders onto a single pallet and transfer them together, reducing freight costs by sharing them across orders.

    This option adds an additional 1–3 week delay on top of the standard 1–3 week supplier lead time.

    If you require your item sooner, please contact us before or after ordering to discuss specific lead times or faster freight options.