Just added to your cart

    View cart ()

    Nissan Patrol (1990-1997) Wagon LWB Petrol 3.0 & 4.2ltr Superior Control Arm Upper

    Regular price
    $240.00
    Sale price
    $240.00
    Regular price
    Sold out
    Unit price
    per 

    Nissan Patrol (1990-1997) Wagon LWB Petrol 3.0 & 4.2ltr Superior Control Arm Upper available on AfterPay. We deliver Australia-wide! – Sydney, Brisbane, Melbourne, Adelaide & Perth.

    Tax included. Shipping calculated at checkout.

    PRODUCT DESCRIPTION

    Street Legal under ADR NCOP

    Lifetime Warranty

    This is a heavy duty bent adjustable Upper Control Arm Suitable For Nissan Patrol GQ/GU with long range fuel tank fitted.

    When fitting a long range fuel tank into Nissan's the top control arm usually hits the tank.

    We have already fixed this problem buy designing a fixed length bent upper control arm to clear the tank.

    Now we have gone one step further by designing an adjustable Bent Upper Control Arm.

    This listing is for one side only and is a perfect upgrade if you have adjustable arms fitted and want to install a long-range tank.

    Sold as an each.

    Superior Engineering now includes ITS Seal Technology on internally threaded adjustable suspension linkages, eliminating the ingress of moisture or liquids that can cause corrosion or rust.

    By adding a specially machined seal groove and incorporating a hydraulic seal between the locking nuts, the thread and the link, a perfect pressure tight seal is created.

    This patented process (PN-2015101600) is EXCLUSIVE to Superior Engineering's internally threaded items such as tierods, draglinks, panhard rods and control arms (upper and lower).

    This product has passed testing for approval under the NCOP system.
    See the flow chart below.

    Approval flow chart

    Generation 2.0 Design Logo

    ITS Technology Diagram

    Patent Number: 2015101600

    Shipping Policy

    Superior Engineering offer custom built suspension solutions, with unique adjustability and performance.

    These kits are assembled to order to suit your requirements, with an average lead time that can vary between 1-3 weeks.

    If you need a specific eta, please contact us before ordering and we will be sure to assist you.

    Consolidated Freight Option

    Consolidated freight allows PPD Performance to combine multiple orders onto a single pallet and transfer them together, reducing freight costs by sharing them across orders.

    This option adds an additional 1–3 week delay on top of the standard 1–3 week supplier lead time.

    If you require your item sooner, please contact us before or after ordering to discuss specific lead times or faster freight options.