Nissan Patrol (1990-1997) Wagon LWB Petrol 3.0 & 4.2ltr Superior Nitro Gas Twin Tube Hybrid Superflex 5 Inch (125mm) Lift Kit

  • Sale
  • Regular price $5,498.00

Nissan Patrol (1990-1997) Wagon LWB Petrol 3.0 & 4.2ltr Superior Nitro Gas Twin Tube Hybrid Superflex 5 Inch (125mm) Lift Kit available on AfterPay. We deliver Australia-wide! – Sydney, Brisbane, Melbourne, Adelaide & Perth.




Please Note: Due to supply issues, the colour of the coil springs you receive may vary from the coils pictured. All coils used in Superior Engineering Kits are made from quality Australian manufacturers.

Superior Nitro Gas Twin Tube Hybrid Superflex 5" Lift Kit Suitable For Nissan Patrol GQ

Superior Engineering has put together a suspension kit to lift your Nissan Patrol 4-5 inches.

Kit includes:

  • 2 x Front Coil Springs
  • 2 x Rear Coil Springs
  • 2 x Superior Engineering Nitro Gas Twin Tube Front Shocks
  • 2 x Superior Engineering Nitro Gas Twin Tube Rear Shocks
  • 1 x Superior Engineering Steering damper
  • 1 x Front H/D adjustable Panhard
  • 1 x Rear H/D adjustable Panhard
  • 1 x Pair Hybrid Super Flex Arms (Lifetime Warranty against Bending)
  • 2 x Extended brake lines
  • 1 x Extended diff breather kit
  • 1 x Extended brake proportioning valve bracket
  • 1 x 4340 H/D adjustable Drag Link (Lifetime Warranty against Bending)
  • 2 x Coil drop out cones
  • 2 x Coil retainers
  • 2 x Damper brackets
  • 2 x Rear upper adjustable Control arms (Lifetime Warranty against Bending)

Superior Engineering Radius Arms now come drilled to suit 85mm sway bar saddles and ABS lines.

For warranty reasons, when fitting a lift kit you should always fill out a "Fitment Form".

Superior Nitro Gas Twin Tube Hybrid Superflex 5 Inch (125mm) Lift Kit Suitable For Nissan Patrol GQ (Kit) - SUP-NG-HBSFKTGQ5


SHIPPING POLICY:

Superior Engineering offer custom built suspension solutions, with unique adjustability and performance.

These kits are assembled to order to suit your requirements, with an average lead time that can vary between 1-3 weeks.

Due to this item exceeding 30kgs we will deliver it to your closest depot unless a COMMERCIAL ADDRESS WITH A FORKIFT is provided on checkout. We can provide door to door delivery options for an extra fee, Please contact our sales team on 1300 773 494 or sales@ppdperformance.com.au within 24hrs of the order being placed if you would like us to quote this option for you.