Just added to your cart

    View cart ()

    Toyota Hilux (2015-2023) EGR AUTO RollTrac Hilux Replacement Hand Rail - Toyota Hilux 2015

    Regular price
    $441.00
    Sale price
    $441.00
    Regular price
    $455.00
    Sold out
    Unit price
    per 

    Toyota Hilux (2015-2023) EGR AUTO RollTrac Hilux Replacement Hand Rail - Toyota Hilux 2015 available on AfterPay. We deliver Australia-wide! – Sydney, Brisbane, Melbourne, Adelaide & Perth.

    Tax included. Shipping calculated at checkout.

    PRODUCT DESCRIPTION

    RollTrac Hilux Replacement Hand Rail - Toyota Hilux 2015

    Product Info

    Restore the performance and precision of your Toyota Hilux 2015-onwards RollTrac with the EGR RollTrac Replacement Hand Rail. This genuine EGR component is designed to replace the original electric hand rail, ensuring your RollTrac system continues to operate smoothly and efficiently.

    Built with high-quality, corrosion-resistant materials, the hand rail offers exceptional strength and durability, providing reliable performance even under harsh Australian conditions. It includes a pair of drive connectors that work seamlessly with your existing RollTrac mechanism to ensure consistent alignment and movement of the cover.

    Perfect for Hilux models equipped with the electric RollTrac system, this replacement hand rail restores both functionality and aesthetics, keeping your ute’s tub protection system in peak working order. Easy to install and designed for a factory fit, it ensures your RollTrac maintains the sleek, integrated appearance it’s known for.

    Package Includes:
    • 1 x Electric Hand Rail
    • 1 x Pair of Drive Connectors

    Note: For proper installation and best results, it is recommended to use the matching Re-Fit Kit with this item.

    NOTE - You should also purchase the matching Re-Fit Kit with this item

    Delivery & Fitment

    Approximate dispatch time: 1-2 business days
    Approximate time from order to fitment: 1-3 weeks
    Leadtime

    EGR Auto For Australian Conditions - Proudly distributed by PPD Performance Please note, these are made to order - generally 3-4 weeks lead time