Just added to your cart

    View cart ()

    Universal Accessories (01/1950-current) Superior Engineering Superior Shock Absorber Shim Stack (90-130 Compression Pack) (Pack) - SUP-SHIM90-130CP

    Regular price
    $99.00
    Sale price
    $99.00
    Regular price
    $21.00
    Sold out
    Unit price
    per 

    Universal Accessories (01/1950-current) Superior Engineering Superior Shock Absorber Shim Stack (90-130 Compression Pack) (Pack) - SUP-SHIM90-130CP available on AfterPay. We deliver Australia-wide! – Sydney, Brisbane, Melbourne, Adelaide & Perth.

    Tax included. Shipping calculated at checkout.

    PRODUCT DESCRIPTION

    Universal Product Banner

    Superior Shock Absorber Shim Stack 90-130 Compression Pack.
    This is the standard shim stack supplied in the Superior shocks suitbale for Patrol GQ/GU Front/Rear,
    LandCruiser 80/100 Series Front/Rear & LandCruiser 76/78/79 Series Front

    This pack has the shims required to valve your Superior Engineering Shocks to the following.

    90kg @ 50cm per second on Compression(Adjuster knob set to 1)
    130kg @ 50cm per second on Compression(Adjuster knob set to 8)

    NOTE: This pack only contains enough shims for one shock.

    Kit Includes the following shims

    1 x 36.5 x 0.2mm bleed spacer
    1 x 36.5 x 0.15 4 key-slot bleed 5.45w
    1 x 36.5 x 0.2mm
    2 x 22 x 0.2mm
    1 x 32 x 0.2mm
    1 x 30 x 0.2mm
    1 x 24 x 0.2mm
    1 x 34 x 4mm Rate Plate(optional)

    Total 9 shims

    Superior Shock Absorber Shim Stack(90-130 Compression Pack)?

    Shipping Policy

    Superior Engineering offer custom built suspension solutions, with unique adjustability and performance.

    These kits are assembled to order to suit your requirements, with an average lead time that can vary between 1-3 weeks.

    If you need a specific eta, please contact us before ordering and we will be sure to assist you.

    Consolidated Freight Option

    Consolidated freight allows PPD Performance to combine multiple orders onto a single pallet and transfer them together, reducing freight costs by sharing them across orders.

    This option adds an additional 1–3 week delay on top of the standard 1–3 week supplier lead time.

    If you require your item sooner, please contact us before or after ordering to discuss specific lead times or faster freight options.